| Project |
Description |
| GREAT RIVER WATER UTILIZATION AUTHORITY – Libya (1994) – Half a Million Cubic Meter Earth Reservoir Capacity |
 |
| Three HIGH RISE WATER STORAGE TANKS – EGYPT(2005) –Special Formworks Design |
 |
| GROINS STABILITY – EGYPT (2006) – Slope Stability of Large Size Groins |
 |
| TRENCH BUILDING MACHINE TBM (2007) – Sending and Receiving Rooms |
 |
| HACIENDARECREATIONAL VILLAGE – EGYPT (2008 – 2016) – Earth Support Structures |
 |
| AMIRIAPIPE RACK – EGYPT (2010) – 74 M Span Pipe rack |
 |
| EXXONMOBIL – MEX FACILITY – EGYPT (2010) – 30 m Span Truss |
 |
| KHALDAOIL COMPANY – EGYPT (2010) – Accommodations Area |
 |
| PETROJETADMINISTRATION BUILDING– EGYPT (2012) – Structure Upgrading of 5 Floors Building |
 |
| PETROSPORT RECREATIONAL VILLAGE – EGYPT (2012) – Innovative Architecture Buildings |
 |
| ALEXANDRIA CHEMICALS TERMINAL – EGYPT (2013) – Soil Improvement by Stone Columns |
 |
| BAYATTOWERS– KSA (2014) – 150 M Sky Scrapers |
 |
| THE EGYPTIAN ETHYLENE AND DERIVATIVES COMPANY – EGYPT (2014) – Structure Analysis and Design Proof |
 |
| EMETHANEX(2010) – Cofferdam |
 |