ABDELMOHSEN CONSULTANTS & ENGINEERS “ACE” previous experience in geotechnical engineering, structure design, quality control and quality assurance applications in similar projects of high standards, top qualities and tight quality control program.
ACE REPRESENTATIVE EXPERIENCE
Owner | Project | Description | Remarks |
Alexandria General
Organization Of Swage & Waste Water -EGYPT |
Feasibility study for Alex. Waste Water & Water Systems |
$100Million |
|
Wisconsin Electrical
Company – USA |
Design of Large Scale SMES Super Magnet Energy Storage Unit | 100MW | |
Department of Energy – USA | Design of Engineering Testing Model For Full Scale Superconductor | 30MW | |
Saudi Kingdom | Al Haram Al Meckkey
Extension |
Multi Billions | Employer- Saudi Diar |
Saudi Kingdom | Al Haram Al Meddaney
Extension |
Multi Billions | Employer – Saudi Diar |
Saudi Kingdom | Al Madinah Car Park | 8000 buses
Capacity |
Employer – Saudi Diar |
Saudi Kingdom | High Rise Buildings – Hotel Al Haram, Governmental / Military Projects | Highly Unique
Projects |
Employer – Saudi Diar |
Alexandria Electricity
Company Distribution |
Electrical Power Stations Gleem, Alseuif, Alagamey | Geotechnical
Investigation Program |
|
The Great Man Made River Authority – LIBEYA | Tarhuna – Weshetata
Earth Fill Dam |
4 Million Cubic meter capacity | Analysis& Study (Geotechnical, Environmental Hydrological)- Design, Specs, Material Selection |
VIBRO For Foundation | Mubarak Central Station | LE150 Million | Tender study, alternatives of Design, Scheme Design |
VIBRO For Foundation | Laurent Complex
Alexandria |
Tender study, alternatives of Design, Scheme Design | |
RASHEED OIL COMPANY -EDCO | ROSETTA FIELD DEVELOPMENT – GROUND IMPROVEMENT & GRADING | Quality Assurance of Field Compaction, Civil works, Road Paving | |
BURLLOUS GAS COMPANY | BURLLOUS GAS FIELD | Quality Assurance of
Field Compaction, Road Paving |
Egyptian LNG Project – IDKU
Phase 1 |
LIQUEFIED OF NATURAL GAS | Quality Assurance of Field Compaction, Road Paving | |
Egyptian LNG Project – IDKU
Phase 2 |
LIQUEFIED OF NATURAL GAS | Quality Assurance of
Civil Works |
|
Egyptian LNG Project
– IDKU – Marine Facilities |
Jetty – Water Break | Quality Assurance of
Civil Works |
|
New Borg Al Arab
Authority |
Al SHABAB HOUSING | New Discrete | Geotechnical Investigation, Foundation Design, Specs, Quality Assurance of Civil Works |
New Borg Al Arab
Authority |
Waste Water Stations D
and H |
Geotechnical Investigations Architecture Structure Design | |
GASCO | Nubareya Power Station | Quality Assurance of
Civil Works |
|
Alexandria Traffic
Authority |
New Extension at Km 27
Desert Road – Alexandria – Cairo High way Road |
Quality Assurance of field compaction, civil works, road paving | |
Bibliotheca Alexandrina – Alexandria |
The Revival Of Alexandria Library |
LE1000 Million | Employer – Bibliotheca Alexandrina |
Linear Alky; Benzene
LAB |
Linear Alky; Benzene
Project, Wadi Alkamer |
Quality Assurance of field compaction, civil works, road paving, Design of Deep Supporting Structures Technical Support | |
Arab Contractors | Rasheed GROINS | LE 100 Million | Geotechnical Design
Checks |
TECHINT | Emethanex Damietta 1
Project |
Process Accommodations Cellular Cofferdam | Quality Assurance of field compaction, civil works, road paving Technical Support |
KHALDA Petroleum
Company |
Northern Pipe
Compression Project |
Accommodation
Area |
Architecture / Structure / Drainage / Water Supply / E / M Systems |
Petrofac | Khalda Field
Phase V |
8 Weeks Field / Laboratory Programs and Modeling | Geotechnical Investigation
Surface Radar Scanning |
GASCO | Maximization of Gas
Capacity C2 & C3 |
|
Geotechnical Investigation Program QC / QA
Technical Support |
Palm Hills | Hacienda II Recreation
Village |
5 Years Project
|
Geotechnical Investigation Program QC / QA For Civil Works
Technical Support Design of MSE Walls |
Petrojet | Petro – Sport
Recreational Facilities |
2.5 Years Project | QC / QA Structure Design Technical Support |
ESTYRENICS | ESTYRENICS | 2 Years Project | QC / QA Technical Support |
British Petroleum / Bechtel | WNDP – Motobus
Site Preparation Phase |
Supply and Apply ONE Million Cubic Meter
6 Month Project |
Third Independent Laboratory |
Alexandria National
Refinery and Petrochemical Company |
Factory Extension | 24 Month Project
Site Preparation Concrete Works Road Paving |
QC / QA Structure Design Technical Support |
Egyptian Petrochemical Company | Petrochemical Project
EEP2 Utilities |
36 Month Projects
Site Preparation Concrete Works Road Paving In Progress |
QC / QA
Technical Support |
Burullus Gas Company | Site Preparation | 85000 Square Meter | QC / QA |
Egyptian Holding Company for Silos and Storage | Silos
Nubarrya, Marriout
|
120000 Ton Storage Capacity
In Progress |
QC / QA Structure Design Technical Support |
Alexandria National Refinery & Petrochemical Company | CCR & Plat Forming Unit | In Progress
Concrete Design Mix Stage |
QC / QA
Civil Works |
َAPC
Petrogas |
Small Projects Size | In Progress | QC / QA
Civil Works |